Wall Concept 210 TOP
02.
Design
Wall Concept 210 TOP
Wall Concept 210 TOP is a single fixed panel against the wall with ceiling support.
Specifications:
- Name: Wall Concept 210 TOP
- Serie: Design
- Type: Single fixed panel against the wall.
- Freestanding installation: Yes
- Combinations: Yes, can to be combined with Wall Concept 210 TOP
- Height: Standard 2000mm
Can be lower than standard
Can be higher than standard (with additional cost) - Width:
Stock/Speed: 770mm; 870mm; 970mm; 1170mm; 1370mm; 1570mm
Other types of glass: 770mm; 870mm; 970mm; 1170mm; 1370mm; 1570mm; 1770mm
Custom made: Max. width until 1800mm - Finish:
Basic colours: Polished, White Matt and Black Matt - Glass: 10mm tempered safety glass (standard NBN 23-002, class NBN EN 12600)
- Types of glass:
Standard +0%*: Transparent
Other types of glass +20%*: Opal mat, Extra transparent, Bronze, Gris, Green, Crepi, Black
Other types of glass +35%*: Opal white, Opal black, Opal bronze, Opal gris
Other types of glass +50%*: Mirror - Glass treatment:
Standard +0%*: No glass treatment
Glass treatment +20%*: Aquaclean
Glass treatment +35%*: Zone Intime, Zone à la carte and Print 112 - Beveling/Cutouts: Not possible.
- Dimensional survey: Possible with additional cost (upon requested).
- Installation: Possible with additional cost (upon requested).
*Is the additional charge calculated on the standard price of the product.
Remarks:
- Product:
Available in fixed dimensions (Stock/Speed & other glass types) and custom-made.
The product is also available through the SPEED range.
Adjustability 7mm (+3.5 mm / -3.5 mm). - Production:
Custom made per mm
Standard: effective width measurement is glass width + profile.
Custom-made: you provide the desired width. Width from tiling to end of glass. - Installation:
A profile of glass must always be placed on the tiling.
If not, this could lead to problems with waterproofing. - Preparation:
Consider the size and weight of the glass.
Can the glass be brought into the bathroom and installed? - Dimensional survey:
Can only take place after the installation of the shower tray and tiling.
